EB Life Safety

Passive Fire Protection — Critical System Support

Passive Fire Protection Assessment & Remediation

EB Life Safety assesses and remediates passive fire protection systems including fire barriers, smoke barriers, opening protection, and hazardous area enclosures per IBC Chapter 7.

When a Passive Fire Protection Review Helps

A focused review is useful when a building is planning a renovation, changing how a space is occupied, investigating a fire inspection finding, or trying to understand whether rated construction has been altered over time. Common triggers include new plumbing or electrical work through rated walls, ceiling changes that affect a rated floor assembly, damaged or missing fire doors, and uncertainty about which walls enclose shafts or exit routes. Owners and managers can also request a survey when drawings are incomplete or past repairs were not documented. The purpose is to establish observed conditions and identify where additional records, opening-up, or specialist testing may be needed; a visual review cannot confirm concealed construction that was not accessible.

Code Basis and Field Review

The review considers the adopted Florida Building Code and applicable existing-building provisions together with relevant IBC fire-protection features, NFPA 101 life-safety requirements, and NFPA 80 or NFPA 105 criteria for opening protectives. Which provisions apply depends on the building, its approved use, the work being performed, and the code edition accepted by the local Authority Having Jurisdiction. Engineers compare available approved plans with accessible field conditions, trace representative barriers and penetrations, and record limitations that prevent verification. Where a listed firestop or opening-protective assembly is involved, the report identifies the observed condition and the listing information needed to evaluate a repair rather than assuming that any sealant or replacement hardware is equivalent.

What the Assessment Documents

A useful deliverable connects each observation to a location and a next step. EB Life Safety can provide a deficiency schedule organized by floor or area, photographs, references to the relevant code or approved assembly, and recommendations for further investigation or corrective work. Findings can distinguish between an observed breach, missing documentation, an inaccessible component, and a condition that needs confirmation by the design professional or AHJ. This distinction helps a board or property manager set priorities without treating every item as the same level of risk. The report can also support a contractor bid package by describing the performance and documentation expected for repair while leaving final means and methods to the qualified installer.

From Findings to Verified Repairs

After the owner reviews the findings, the team can help define a practical sequence for repairs around building access, occupied areas, and other construction. Work may involve restoring a rated assembly, installing a tested firestop system that matches the penetration and construction, repairing or replacing an opening protective, or obtaining records that confirm an existing installation. The engineer can review proposed details, coordinate questions with the contractor and AHJ, and document agreed next steps. Closeout records should identify completed locations and include the product or listing information and inspection documentation required for the work. Overall timing depends on the number of locations, access, concealed conditions, permit review, and contractor availability; those factors are established during scoping rather than assumed in advance.

Scope, Repair Records, and Closeout

Before a field visit, the owner or manager can assemble approved life-safety plans, renovation permits, firestop submittals, door and damper schedules, and prior inspection records. EB Life Safety can compare these materials with the survey scope and identify what should be verified on site. If a record set is incomplete, the assessment can document what is known, identify gaps that affect the conclusions, and propose follow-up rather than treating missing paperwork as proof of failure or compliance. This distinction helps a board separate observed conditions from administrative items and questions that require direction from the Authority Having Jurisdiction. During the survey, findings can be grouped by floor, barrier type, or work package so a contractor receives a traceable list instead of a broad statement that rated construction needs repair. The team can record representative locations, photographs, the apparent assembly or opening protective, and whether the condition was accessible and verifiable. When a repair depends on a listed system, the report can identify information needed to evaluate a compatible repair, such as the substrate, penetrating item, opening dimensions, required fire-resistance rating, and tested system information where available. These are scoping details, not approval of a contractor's proposed means and methods. After the owner prioritizes work, EB Life Safety can review proposed repair documentation and coordinate clarification with the design team or AHJ. Closeout records may include updated location information, installer documentation, inspection evidence, and unresolved limitations. In an occupied building, the work plan can coordinate access with residents, tenants, and maintenance staff; work above ceilings or at egress openings may need sequencing around normal operations. The final scope should state what was inspected, what remained inaccessible, and which follow-up actions are still open. Clear records support future renovations and maintenance without implying that one survey certifies every concealed assembly in the building.

Frequently Asked Questions

When should an owner request a passive fire protection assessment?

Consider an assessment before renovation, after changes that penetrate rated construction, when inspection findings identify fire barriers or opening protectives, or when building records do not match accessible field conditions.

What codes are considered for an existing Florida building?

The review considers the applicable adopted Florida Building Code and existing-building provisions, relevant IBC fire-protection features, NFPA 101, and NFPA 80 or NFPA 105 where opening protectives are involved. The AHJ and project scope determine the applicable edition and requirements.

What does the owner receive?

The scope can include a location-based deficiency list, photographs, code or assembly references, limitations on what could be verified, and recommended next steps for repair, additional investigation, contractor coordination, or AHJ review.